Merrillan - Electric Outage - Partial – Incident details

All systems operational

Electric Outage - Partial

ResolvedPartial outage1 hour 46 minutes

Affected

Electric Utility

Partial outage from 11:36 PM to 12:04 AM, Operational from 12:04 AM to 1:22 AM

  • ResolvedUTC
    This incident has been resolved.
  • MonitoringUTC

    Substation Update: Fuse Replaced, System Under Active Monitoring

    Heavy electrical load caused a fuse to blow at the local substation earlier today. Crews have replaced the fuse, and our team is actively monitoring the system to ensure the fix holds under current conditions.

    With extreme heat, heavy air conditioning use, and peak evening energy demands straining the local grid, the system remains under high pressure. To help keep power stable and prevent another outage while we monitor performance, please minimize unnecessary electricity use during these peak hours.

  • InvestigatingUTC

    We are investigating a partial electric outage within the Village.