  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 36 minutes

    Affected Components: Electric Utility
    Aug 20, 18:18:39 GMT+0 - Investigating - Tree took out lines, power fully cut to safely restore. ETR \~20 minutes. We are investigating a partial electric outage within the Village. Aug 20, 18:54:53 GMT+0 - Resolved - This incident has been resolved. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 36 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 20&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;18:18:39&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  Tree took out lines, power fully cut to safely restore. ETR \~20 minutes. We are investigating a partial electric outage within the Village..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 20&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;18:54:53&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Thu, 20 Aug 2026 18:18:39 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cmt1ugg9h06dl22pbm8d9u8fp</link>
  <guid>https://status.merrillanwi.gov/incident/cmt1ugg9h06dl22pbm8d9u8fp</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 50 minutes

    Affected Components: Electric Utility
    Aug 19, 23:30:19 GMT+0 - Investigating - We are investigating a partial electric outage within the Village. Aug 19, 23:34:08 GMT+0 - Identified - Issue identified and crews with equipment are enroute.  Aug 20, 00:02:32 GMT+0 - Monitoring - We implemented a fix and are currently monitoring the result. Aug 20, 00:20:38 GMT+0 - Resolved - This incident has been resolved. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 50 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 19&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;23:30:19&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating a partial electric outage within the Village..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 19&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;23:34:08&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Issue identified and crews with equipment are enroute. .&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 20&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;00:02:32&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Monitoring&lt;/strong&gt; -
  We implemented a fix and are currently monitoring the result..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 20&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;00:20:38&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Wed, 19 Aug 2026 23:30:19 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cmt0q5efh05pe0kqjcwpn6xbe</link>
  <guid>https://status.merrillanwi.gov/incident/cmt0q5efh05pe0kqjcwpn6xbe</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 1 hour and 46 minutes

    Affected Components: Electric Utility
    Jul 26, 23:36:00 GMT+0 - Investigating - We are investigating a partial electric outage within the Village. Jul 27, 00:04:34 GMT+0 - Monitoring - **Substation Update: Fuse Replaced, System Under Active Monitoring**

Heavy electrical load caused a fuse to blow at the local substation earlier today. Crews have replaced the fuse, and our team is actively monitoring the system to ensure the fix holds under current conditions.

With extreme heat, heavy air conditioning use, and peak evening energy demands straining the local grid, the system remains under high pressure. To help keep power stable and prevent another outage while we monitor performance, please minimize unnecessary electricity use during these peak hours. Jul 27, 01:22:10 GMT+0 - Resolved - This incident has been resolved. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 1 hour and 46 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 26&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;23:36:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating a partial electric outage within the Village..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 27&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;00:04:34&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Monitoring&lt;/strong&gt; -
  **Substation Update: Fuse Replaced, System Under Active Monitoring**

Heavy electrical load caused a fuse to blow at the local substation earlier today. Crews have replaced the fuse, and our team is actively monitoring the system to ensure the fix holds under current conditions.

With extreme heat, heavy air conditioning use, and peak evening energy demands straining the local grid, the system remains under high pressure. To help keep power stable and prevent another outage while we monitor performance, please minimize unnecessary electricity use during these peak hours..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 27&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;01:22:10&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Sun, 26 Jul 2026 23:36:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cms2ghxg50oma0rqdi0vitsud</link>
  <guid>https://status.merrillanwi.gov/incident/cms2ghxg50oma0rqdi0vitsud</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 1 hour and 42 minutes

    Affected Components: Electric Utility
    Jul 8, 23:32:18 GMT+0 - Identified - We are investigating a partial electric outage within the Village. Line down on Wisconsin St. Remaining customers will be without power for staff safety once repairs begin shortly.  Jul 9, 01:14:38 GMT+0 - Resolved - This incident has been resolved. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 1 hour and 42 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 8&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;23:32:18&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are investigating a partial electric outage within the Village. Line down on Wisconsin St. Remaining customers will be without power for staff safety once repairs begin shortly. .&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 9&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;01:14:38&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Wed, 8 Jul 2026 23:32:18 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cmrcpq6nr01h90rljf3osszq5</link>
  <guid>https://status.merrillanwi.gov/incident/cmrcpq6nr01h90rljf3osszq5</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 10 hours and 50 minutes

    Affected Components: Electric Utility
    Jun 20, 02:05:00 GMT+0 - Investigating - We are investigating a partial electric outage within the Village. Bunting / Beach Dr area. We also have a tree to address on a secondary line to a customer but no outage. Jun 20, 12:55:00 GMT+0 - Resolved - This incident has been resolved.

Field Action: Exhaustively patrolled lines on foot and by truck from approximately 9:00 PM to 1 AM. Checked all spans, creek crossings, and terminations. Found no branches, crossed wires, or physical faults. Disconnected the transformer near the lightning strike, but the 25A fuse continued to blow.

Performed a second comprehensive physical line inspection during daylight hours before attempting further re-energization; confirmed zero physical hazards or line contact present.

Conclusion: The nearby lightning strike did not cause physical damage, but it severely unbalanced the electrical charge on this portion of the system. Without a ground wire to bleed off that extra energy, closing the final door caused a massive, momentary surge of &quot;charging power&quot; that kept popping the tight 25A fuse.

Fix: At 8:00 AM, stepped up to a 50A fuse to handle that initial startup surge and reversed the phase-closing sequence. The line stabilized immediately, restored power, and has been holding for 5+ hours. Jun 20, 02:43:30 GMT+0 - Identified - We are continuing to work on a fix for this incident. Jun 20, 04:09:38 GMT+0 - Investigating - We are still working to locate the source of the outage. Jun 20, 05:50:37 GMT+0 - Investigating - Unfortunately we have not been able to locate the source of the outage so far after driving and walking the outage area multiple times. We will have to wait until daylight to better identify what the cause may be. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 10 hours and 50 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Jun &lt;var data-var=&#039;date&#039;&gt; 20&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;02:05:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating a partial electric outage within the Village. Bunting / Beach Dr area. We also have a tree to address on a secondary line to a customer but no outage..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jun &lt;var data-var=&#039;date&#039;&gt; 20&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;12:55:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved.

Field Action: Exhaustively patrolled lines on foot and by truck from approximately 9:00 PM to 1 AM. Checked all spans, creek crossings, and terminations. Found no branches, crossed wires, or physical faults. Disconnected the transformer near the lightning strike, but the 25A fuse continued to blow.

Performed a second comprehensive physical line inspection during daylight hours before attempting further re-energization; confirmed zero physical hazards or line contact present.

Conclusion: The nearby lightning strike did not cause physical damage, but it severely unbalanced the electrical charge on this portion of the system. Without a ground wire to bleed off that extra energy, closing the final door caused a massive, momentary surge of &quot;charging power&quot; that kept popping the tight 25A fuse.

Fix: At 8:00 AM, stepped up to a 50A fuse to handle that initial startup surge and reversed the phase-closing sequence. The line stabilized immediately, restored power, and has been holding for 5+ hours..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jun &lt;var data-var=&#039;date&#039;&gt; 20&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;02:43:30&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are continuing to work on a fix for this incident..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jun &lt;var data-var=&#039;date&#039;&gt; 20&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;04:09:38&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are still working to locate the source of the outage..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jun &lt;var data-var=&#039;date&#039;&gt; 20&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;05:50:37&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  Unfortunately we have not been able to locate the source of the outage so far after driving and walking the outage area multiple times. We will have to wait until daylight to better identify what the cause may be..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Sat, 20 Jun 2026 02:05:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cmqlpt6rs197t2omlg6i3lihd</link>
  <guid>https://status.merrillanwi.gov/incident/cmqlpt6rs197t2omlg6i3lihd</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 6 hours and 13 minutes

    Affected Components: Electric Utility
    Apr 14, 05:11:00 GMT+0 - Investigating - We are investigating a partial electric outage within the Village. Apr 14, 06:54:31 GMT+0 - Identified - We are continuing to work on a fix for this incident. Tree took out a line on South Hayden. Work in progress. Apr 14, 07:10:05 GMT+0 - Identified - We have located several lines down along South Hayden St and are working to restore. Apr 14, 08:09:48 GMT+0 - Identified - We are continuing to work on a fix for this incident. Apr 14, 09:39:40 GMT+0 - Identified - We continue to repair the multiple lines that are down and hope to have this completed soon. Apr 14, 11:24:00 GMT+0 - Resolved - This incident has been resolved. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 6 hours and 13 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Apr &lt;var data-var=&#039;date&#039;&gt; 14&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;05:11:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating a partial electric outage within the Village..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Apr &lt;var data-var=&#039;date&#039;&gt; 14&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;06:54:31&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are continuing to work on a fix for this incident. Tree took out a line on South Hayden. Work in progress..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Apr &lt;var data-var=&#039;date&#039;&gt; 14&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;07:10:05&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We have located several lines down along South Hayden St and are working to restore..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Apr &lt;var data-var=&#039;date&#039;&gt; 14&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;08:09:48&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are continuing to work on a fix for this incident..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Apr &lt;var data-var=&#039;date&#039;&gt; 14&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;09:39:40&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We continue to repair the multiple lines that are down and hope to have this completed soon..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Apr &lt;var data-var=&#039;date&#039;&gt; 14&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;11:24:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Tue, 14 Apr 2026 05:11:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cmny96pij003hjqsob1r3m2ax</link>
  <guid>https://status.merrillanwi.gov/incident/cmny96pij003hjqsob1r3m2ax</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 5 hours and 8 minutes

    Affected Components: Sewer, Water Utility, Electric Utility
    Apr 2, 12:53:31 GMT+0 - Investigating - We are investigating a partial electric outage within the Village. Apr 2, 13:18:01 GMT+0 - Identified - We are continuing to work on a fix for this incident. Center St line down. Apr 2, 15:10:29 GMT+0 - Identified - We are continuing to work on a fix for this incident. First outage from Center St should be resolved soon. New line down on Oakwood Pl to address. Apr 2, 15:25:00 GMT+0 - Identified - We are continuing to work on a fix for this incident at Oakwood. Center St is resolved. Apr 2, 16:12:30 GMT+0 - Monitoring - All outages resolved at this moment. We are currently monitoring for any additional outages. Apr 2, 18:01:02 GMT+0 - Resolved - This incident has been resolved. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 5 hours and 8 minutes</p>
    <p><strong>Affected Components:</strong> , , </p>
    &lt;p&gt;&lt;small&gt;Apr &lt;var data-var=&#039;date&#039;&gt; 2&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;12:53:31&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating a partial electric outage within the Village..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Apr &lt;var data-var=&#039;date&#039;&gt; 2&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;13:18:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are continuing to work on a fix for this incident. Center St line down..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Apr &lt;var data-var=&#039;date&#039;&gt; 2&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;15:10:29&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are continuing to work on a fix for this incident. First outage from Center St should be resolved soon. New line down on Oakwood Pl to address..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Apr &lt;var data-var=&#039;date&#039;&gt; 2&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;15:25:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are continuing to work on a fix for this incident at Oakwood. Center St is resolved..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Apr &lt;var data-var=&#039;date&#039;&gt; 2&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;16:12:30&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Monitoring&lt;/strong&gt; -
  All outages resolved at this moment. We are currently monitoring for any additional outages..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Apr &lt;var data-var=&#039;date&#039;&gt; 2&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;18:01:02&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Thu, 2 Apr 2026 12:53:31 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cmnhh7259003avxopt3f71k5g</link>
  <guid>https://status.merrillanwi.gov/incident/cmnhh7259003avxopt3f71k5g</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 2 hours and 51 minutes

    Affected Components: Electric Utility
    Mar 21, 19:55:00 GMT+0 - Investigating - We are investigating a partial electric outage within the Lower Lake area of the Village. Mar 21, 22:46:15 GMT+0 - Resolved - This incident has been resolved. Trees on lines. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 2 hours and 51 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 21&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;19:55:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating a partial electric outage within the Lower Lake area of the Village..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 21&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;22:46:15&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved. Trees on lines..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Sat, 21 Mar 2026 19:55:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cmn0r8q230cw6jafch1ejpjdr</link>
  <guid>https://status.merrillanwi.gov/incident/cmn0r8q230cw6jafch1ejpjdr</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 24 days, 1 hour and 5 minutes

    Affected Components: Electric Utility
    Nov 8, 17:13:00 GMT+0 - Investigating - We are investigating a partial electric outage within the Village caused by construction on Hayden St. Nov 8, 18:18:00 GMT+0 - Resolved - This incident has been resolved. Nov 8, 18:18:01 GMT+0 - Postmortem - Construction company boom hit power line and snapped it.  
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 24 days, 1 hour and 5 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Nov &lt;var data-var=&#039;date&#039;&gt; 8&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;17:13:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating a partial electric outage within the Village caused by construction on Hayden St..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Nov &lt;var data-var=&#039;date&#039;&gt; 8&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;18:18:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Nov &lt;var data-var=&#039;date&#039;&gt; 8&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;18:18:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Postmortem&lt;/strong&gt; -
  Construction company boom hit power line and snapped it. .&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Sat, 8 Nov 2025 17:13:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cmhqjz4is00xk8vpa6z9kp5yi</link>
  <guid>https://status.merrillanwi.gov/incident/cmhqjz4is00xk8vpa6z9kp5yi</guid>
</item>

<item>
  <title>Lower Lake Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 1 hour and 55 minutes

    Affected Components: Electric Utility
    Oct 17, 18:20:00 GMT+0 - Identified - Lower Lake - We are investigating a partial electric outage within the Village. Oct 17, 20:15:00 GMT+0 - Resolved - This incident has been resolved. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 1 hour and 55 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Oct &lt;var data-var=&#039;date&#039;&gt; 17&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;18:20:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Lower Lake - We are investigating a partial electric outage within the Village..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Oct &lt;var data-var=&#039;date&#039;&gt; 17&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;20:15:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Fri, 17 Oct 2025 18:20:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cmgv77y8g00ke135w2j8nu9tx</link>
  <guid>https://status.merrillanwi.gov/incident/cmgv77y8g00ke135w2j8nu9tx</guid>
</item>

<item>
  <title>Bunting Ln Powerline Maintenance</title>
  <description>
    Type: Maintenance
    Duration: 4 hours

    Affected Components: Electric Utility
    Oct 2, 13:00:00 GMT+0 - Identified - We are planning for a scheduled maintenance during that time. Oct 2, 17:00:00 GMT+0 - Completed - Maintenance has completed successfully Oct 2, 13:00:01 GMT+0 - Identified - Maintenance is now in progress 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 4 hours</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Oct &lt;var data-var=&#039;date&#039;&gt; 2&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;13:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are planning for a scheduled maintenance during that time..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Oct &lt;var data-var=&#039;date&#039;&gt; 2&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;17:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Oct &lt;var data-var=&#039;date&#039;&gt; 2&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;13:00:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress.&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Thu, 2 Oct 2025 13:00:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/maintenance/cmg6jz0yo07f2vyrro4301abt</link>
  <guid>https://status.merrillanwi.gov/maintenance/cmg6jz0yo07f2vyrro4301abt</guid>
</item>

<item>
  <title>Lower Lake Electric Maintenance</title>
  <description>
    Type: Maintenance
    Duration: 2 hours

    Affected Components: Electric Utility
    Sep 11, 14:00:00 GMT+0 - Identified - We will be performing power line maintenance on the Lower Lake loop that we will have to cut power in order to perform. It will only affect the Lower Lake loop beginning on 9/11/25 at 9am for approximately 2 hours. Sep 11, 16:00:00 GMT+0 - Completed - Maintenance has completed successfully Sep 11, 14:00:01 GMT+0 - Identified - Maintenance is now in progress 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 2 hours</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 11&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;14:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We will be performing power line maintenance on the Lower Lake loop that we will have to cut power in order to perform. It will only affect the Lower Lake loop beginning on 9/11/25 at 9am for approximately 2 hours..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 11&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;16:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 11&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;14:00:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress.&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Thu, 11 Sep 2025 14:00:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/maintenance/cmfe52pym000frfl6lse411g9</link>
  <guid>https://status.merrillanwi.gov/maintenance/cmfe52pym000frfl6lse411g9</guid>
</item>

<item>
  <title>Emergency Electric Repair</title>
  <description>
    Type: Maintenance
    Duration: 2 days and 12 hours

    Affected Components: Electric Utility
    Sep 10, 15:00:00 GMT+0 - Completed - Maintenance has completed successfully. Sep 10, 14:00:00 GMT+0 - Identified - There will be power outage today from 9 a.m. to approx. 10 a.m. due to a emergency repair. This will effect everyone west of Union Pacific tracks on Hwy 95 and the north end of the Village. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 2 days and 12 hours</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 10&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;15:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Sep &lt;var data-var=&#039;date&#039;&gt; 10&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;14:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  There will be power outage today from 9 a.m. to approx. 10 a.m. due to a emergency repair. This will effect everyone west of Union Pacific tracks on Hwy 95 and the north end of the Village..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Wed, 10 Sep 2025 14:00:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/maintenance/cmfe2cwgv0022chgqdum7li08</link>
  <guid>https://status.merrillanwi.gov/maintenance/cmfe2cwgv0022chgqdum7li08</guid>
</item>

<item>
  <title>Emergency Electric Pole Repair</title>
  <description>
    Type: Maintenance
    Duration: 3 hours and 26 minutes

    Affected Components: Electric Utility
    Aug 13, 15:00:00 GMT+0 - Identified - Wednesday, August 13th, 2025 Village Utilities personnel will be performing an emergency electric repair to a broken pole which will result in an outage near the following locations: **Loomis St, Hammond St, Main St**  
This will be from roughly **10am-1pm**. We apologize for the short notice. Aug 13, 18:02:42 GMT+0 - Identified - Still in progress. Will update when avaialble. Aug 13, 15:00:01 GMT+0 - Identified - Maintenance is now in progress Aug 13, 18:25:36 GMT+0 - Completed - Maintenance has completed successfully. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 3 hours and 26 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 13&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;15:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Wednesday, August 13th, 2025 Village Utilities personnel will be performing an emergency electric repair to a broken pole which will result in an outage near the following locations: **Loomis St, Hammond St, Main St**  
This will be from roughly **10am-1pm**. We apologize for the short notice..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 13&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;18:02:42&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Still in progress. Will update when avaialble..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 13&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;15:00:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 13&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;18:25:36&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Wed, 13 Aug 2025 15:00:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/maintenance/cme9i7pl60046cnbskd6dsy6y</link>
  <guid>https://status.merrillanwi.gov/maintenance/cme9i7pl60046cnbskd6dsy6y</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 1 hour

    Affected Components: Electric Utility
    Aug 8, 00:00:00 GMT+0 - Investigating - We are currently investigating this incident. Aug 8, 01:00:00 GMT+0 - Resolved - This incident has been resolved. Wire burned up on Green St near fuses. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 1 hour</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 8&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;00:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are currently investigating this incident..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Aug &lt;var data-var=&#039;date&#039;&gt; 8&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;01:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved. Wire burned up on Green St near fuses..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Fri, 8 Aug 2025 00:00:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cme22jhog011w5jesvtfeofxn</link>
  <guid>https://status.merrillanwi.gov/incident/cme22jhog011w5jesvtfeofxn</guid>
</item>

<item>
  <title>Electric Line Maintenance - Begins 7/17 @ 11am</title>
  <description>
    Type: Maintenance
    Duration: 3 hours and 24 minutes

    Affected Components: Electric Utility
    Jul 17, 19:24:08 GMT+0 - Completed - Maintenance has completed successfully. Jul 17, 16:00:00 GMT+0 - Identified - In preparation for the upcoming water/sewer and street project along Hayden St &amp; Mill St, electric poles will need to be moved. As a result, power will have to be cut for approximately 3 hours to perform this safety and will affect the following areas: Center St, East St, South Hayden St, Bunting Ln, Highway 95 East/E Pearl St, and Lower Lake Rd. Jul 17, 16:00:01 GMT+0 - Identified - Maintenance is now in progress 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Maintenance</p>
    <p><strong>Duration:</strong> 3 hours and 24 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 17&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;19:24:08&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Completed&lt;/strong&gt; -
  Maintenance has completed successfully..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 17&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;16:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  In preparation for the upcoming water/sewer and street project along Hayden St &amp; Mill St, electric poles will need to be moved. As a result, power will have to be cut for approximately 3 hours to perform this safety and will affect the following areas: Center St, East St, South Hayden St, Bunting Ln, Highway 95 East/E Pearl St, and Lower Lake Rd..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 17&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;16:00:01&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Maintenance is now in progress.&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Thu, 17 Jul 2025 16:00:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/maintenance/cmd6af7lj00hr9donl2qt0c80</link>
  <guid>https://status.merrillanwi.gov/maintenance/cmd6af7lj00hr9donl2qt0c80</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 1 hour and 24 minutes

    Affected Components: Electric Utility
    Jun 21, 21:26:00 GMT+0 - Investigating - We are investigating a partial electric outage within the Village. Jun 21, 22:50:00 GMT+0 - Resolved - This incident has been resolved. Fuse on Main St popped due to load and heat (weather). Replaced fuse with 100 (had 65) and power restored. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 1 hour and 24 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Jun &lt;var data-var=&#039;date&#039;&gt; 21&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;21:26:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating a partial electric outage within the Village..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jun &lt;var data-var=&#039;date&#039;&gt; 21&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;22:50:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved. Fuse on Main St popped due to load and heat (weather). Replaced fuse with 100 (had 65) and power restored..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Sat, 21 Jun 2025 21:26:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cmc6vrjnf000luvxoj2himrmq</link>
  <guid>https://status.merrillanwi.gov/incident/cmc6vrjnf000luvxoj2himrmq</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 52 minutes

    Affected Components: Electric Utility
    Jun 5, 02:45:00 GMT+0 - Identified - Temporary cut on S Hayden St to repair arcing line. We are investigating a partial electric outage within the Village. Jun 5, 03:37:08 GMT+0 - Resolved - This incident has been resolved. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 52 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Jun &lt;var data-var=&#039;date&#039;&gt; 5&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;02:45:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Temporary cut on S Hayden St to repair arcing line. We are investigating a partial electric outage within the Village..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jun &lt;var data-var=&#039;date&#039;&gt; 5&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;03:37:08&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Thu, 5 Jun 2025 02:45:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cmbishgsa000nstidsxx7k4p6</link>
  <guid>https://status.merrillanwi.gov/incident/cmbishgsa000nstidsxx7k4p6</guid>
</item>

<item>
  <title>Electric Outage - Degraded</title>
  <description>
    Type: Incident
    Duration: 2 hours and 1 minute

    Affected Components: Electric Utility
    Mar 15, 09:32:29 GMT+0 - Identified - Issue identified, tree on line - checking additional locations. Mar 15, 08:06:00 GMT+0 - Investigating - We are investigating an electric issue within the Village. Low voltage detected on phases A&amp;C at Lower Lake Hydro. Mar 15, 10:07:12 GMT+0 - Resolved - This incident has been resolved. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 2 hours and 1 minute</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 15&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;09:32:29&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Issue identified, tree on line - checking additional locations..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 15&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;08:06:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating an electric issue within the Village. Low voltage detected on phases A&amp;C at Lower Lake Hydro..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 15&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;10:07:12&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Sat, 15 Mar 2025 08:06:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cm89x909r001t10f51zfteann</link>
  <guid>https://status.merrillanwi.gov/incident/cm89x909r001t10f51zfteann</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 1 hour and 35 minutes

    Affected Components: Electric Utility
    Mar 5, 21:55:00 GMT+0 - Investigating - We are investigating a partial electric outage within the Village. Mar 5, 23:30:00 GMT+0 - Resolved - This incident has been resolved. Large branch on a line located near Green St. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 1 hour and 35 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 5&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;21:55:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating a partial electric outage within the Village..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 5&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;23:30:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved. Large branch on a line located near Green St..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Wed, 5 Mar 2025 21:55:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cm7wlcjx1000azj0pkql71bs8</link>
  <guid>https://status.merrillanwi.gov/incident/cm7wlcjx1000azj0pkql71bs8</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 1 hour and 2 minutes

    Affected Components: Electric Utility
    Mar 5, 18:55:10 GMT+0 - Investigating - We are investigating a partial electric outage within the Village. Mar 5, 19:57:00 GMT+0 - Resolved - This incident has been resolved. A tree branch was located on a line on Wisconsin St. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 1 hour and 2 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 5&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;18:55:10&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating a partial electric outage within the Village..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 5&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;19:57:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved. A tree branch was located on a line on Wisconsin St..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Wed, 5 Mar 2025 18:55:10 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cm7wa2cyp002a68piv90062ch</link>
  <guid>https://status.merrillanwi.gov/incident/cm7wa2cyp002a68piv90062ch</guid>
</item>

<item>
  <title>Electric Outage - Blackout</title>
  <description>
    Type: Incident
    Duration: 8 days and 12 hours

    Affected Components: Electric Utility
    Mar 4, 19:00:00 GMT+0 - Identified - Electric maintenance in progress. Mar 4, 22:24:00 GMT+0 - Resolved - Repairs complete. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 8 days and 12 hours</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 4&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;19:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  Electric maintenance in progress..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 4&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;22:24:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  Repairs complete..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Tue, 4 Mar 2025 19:00:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cm7uw86mp002b129eocsanrqt</link>
  <guid>https://status.merrillanwi.gov/incident/cm7uw86mp002b129eocsanrqt</guid>
</item>

<item>
  <title>Electric Outage - Degraded</title>
  <description>
    Type: Incident
    Duration: 4 hours and 38 minutes

    Affected Components: Electric Utility
    Mar 4, 05:57:34 GMT+0 - Identified - We are investigating an electric issue within the Village. Mar 4, 10:02:16 GMT+0 - Identified - An issue with our primary lines has been identified, Fixes are in progress, but unfortunately there is still no time available for resolution yet. Mar 4, 11:36:00 GMT+0 - Resolved - This incident has been resolved. See attachment for details. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 4 hours and 38 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 4&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;05:57:34&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are investigating an electric issue within the Village..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 4&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;10:02:16&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  An issue with our primary lines has been identified, Fixes are in progress, but unfortunately there is still no time available for resolution yet..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 4&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;11:36:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved. See attachment for details..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Tue, 4 Mar 2025 05:57:34 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cm7u2ui4t00kx1qqavxkwmyto</link>
  <guid>https://status.merrillanwi.gov/incident/cm7u2ui4t00kx1qqavxkwmyto</guid>
</item>

<item>
  <title>Electric Outage - Degraded</title>
  <description>
    Type: Incident
    Duration: 1 hour and 52 minutes

    Affected Components: Electric Utility
    Feb 28, 22:14:09 GMT+0 - Resolved - Electric is now operational!  Mar 1, 01:55:24 GMT+0 - Resolved - Wind event - Bunting Ln Feb 28, 20:21:47 GMT+0 - Investigating - We are investigating an electric issue within the Village. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 1 hour and 52 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Feb &lt;var data-var=&#039;date&#039;&gt; 28&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;22:14:09&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  Electric is now operational! .&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Mar &lt;var data-var=&#039;date&#039;&gt; 1&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;01:55:24&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  Wind event - Bunting Ln.&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Feb &lt;var data-var=&#039;date&#039;&gt; 28&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;20:21:47&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating an electric issue within the Village..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Fri, 28 Feb 2025 20:21:47 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cm7p7yhnl00083aheu1p9loc2</link>
  <guid>https://status.merrillanwi.gov/incident/cm7p7yhnl00083aheu1p9loc2</guid>
</item>

<item>
  <title>Electric Outage - Degraded</title>
  <description>
    Type: Incident
    Duration: 1 hour and 33 minutes

    
    Feb 7, 12:17:38 GMT+0 - Resolved - Electric is now operational!  Feb 7, 10:45:07 GMT+0 - Investigating - We are investigating an electric issue within the Village. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 1 hour and 33 minutes</p>
    
    &lt;p&gt;&lt;small&gt;Feb &lt;var data-var=&#039;date&#039;&gt; 7&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;12:17:38&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  Electric is now operational! .&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Feb &lt;var data-var=&#039;date&#039;&gt; 7&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;10:45:07&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating an electric issue within the Village..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Fri, 7 Feb 2025 10:45:07 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cm6un40fd00313e593ir47yd3</link>
  <guid>https://status.merrillanwi.gov/incident/cm6un40fd00313e593ir47yd3</guid>
</item>

<item>
  <title>Electric Outage - Degraded</title>
  <description>
    Type: Incident
    Duration: 3 days, 1 hour and 10 minutes

    
    Dec 4, 20:15:42 GMT+0 - Investigating - We are investigating an electric issue within the Village. Dec 4, 21:28:52 GMT+0 - Resolved - Electric is now operational!

Tree fell on a line off Bunting Ln. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 3 days, 1 hour and 10 minutes</p>
    
    &lt;p&gt;&lt;small&gt;Dec &lt;var data-var=&#039;date&#039;&gt; 4&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;20:15:42&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating an electric issue within the Village..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Dec &lt;var data-var=&#039;date&#039;&gt; 4&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;21:28:52&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  Electric is now operational!

Tree fell on a line off Bunting Ln..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Wed, 4 Dec 2024 20:15:42 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cm4abvev600guk94lgaw21y0r</link>
  <guid>https://status.merrillanwi.gov/incident/cm4abvev600guk94lgaw21y0r</guid>
</item>

<item>
  <title>Electric Outage - Degraded</title>
  <description>
    Type: Incident
    Duration: 19 hours and 33 minutes

    
    Nov 18, 19:16:27 GMT+0 - Resolved - Electric is now operational!  Nov 18, 18:56:54 GMT+0 - Investigating - We are investigating an electric issue within the Village. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 19 hours and 33 minutes</p>
    
    &lt;p&gt;&lt;small&gt;Nov &lt;var data-var=&#039;date&#039;&gt; 18&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;19:16:27&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  Electric is now operational! .&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Nov &lt;var data-var=&#039;date&#039;&gt; 18&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;18:56:54&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating an electric issue within the Village..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Mon, 18 Nov 2024 18:56:54 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cm3ne0gbo019rrmi0mh8dequj</link>
  <guid>https://status.merrillanwi.gov/incident/cm3ne0gbo019rrmi0mh8dequj</guid>
</item>

<item>
  <title>Electric Line Maintenance - Begins 7/11 @9am</title>
  <description>
    Type: Incident
    Duration: 3 hours

    Affected Components: Electric Utility
    Jul 11, 14:00:00 GMT+0 - Monitoring - Electric line maintenance will be underway that will affect Bunting Ln and East Pearl St residents from approximately 9am-10am CST. The power will be out for approximately 30-60 minutes if everything goes smooth. The purpose of this maintenance is to address a line issue in a tough-to-reach area that has been causing increased outages recently. Please plan accordingly. Jul 11, 17:00:00 GMT+0 - Resolved - This incident has been resolved. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 3 hours</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 11&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;14:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Monitoring&lt;/strong&gt; -
  Electric line maintenance will be underway that will affect Bunting Ln and East Pearl St residents from approximately 9am-10am CST. The power will be out for approximately 30-60 minutes if everything goes smooth. The purpose of this maintenance is to address a line issue in a tough-to-reach area that has been causing increased outages recently. Please plan accordingly..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 11&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;17:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Thu, 11 Jul 2024 14:00:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/clyexzxtj150606hkn1gugtlpbx</link>
  <guid>https://status.merrillanwi.gov/incident/clyexzxtj150606hkn1gugtlpbx</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 6 days and 21 hours

    Affected Components: Electric Utility
    Jul 7, 14:45:00 GMT+0 - Resolved - Power outage was caused by a squirrel. Jul 7, 12:00:00 GMT+0 - Investigating - We are investigating a partial electric outage within the Village. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 6 days and 21 hours</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 7&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;14:45:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  Power outage was caused by a squirrel..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 7&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;12:00:00&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Investigating&lt;/strong&gt; -
  We are investigating a partial electric outage within the Village..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Sun, 7 Jul 2024 12:00:00 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/clyeybs2m156275hdn1nu6fulg7</link>
  <guid>https://status.merrillanwi.gov/incident/clyeybs2m156275hdn1nu6fulg7</guid>
</item>

<item>
  <title>Electric Outage - Partial</title>
  <description>
    Type: Incident
    Duration: 1 hour and 42 minutes

    Affected Components: Electric Utility
    Jul 5, 01:41:52 GMT+0 - Resolved - This incident has been resolved. Jul 4, 23:59:52 GMT+0 - Identified - We are investigating a partial electric outage within the Village. 
  </description>
  <content:encoded>
    <![CDATA[<p><strong>Type:</strong> Incident</p>
    <p><strong>Duration:</strong> 1 hour and 42 minutes</p>
    <p><strong>Affected Components:</strong> </p>
    &lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 5&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;01:41:52&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Resolved&lt;/strong&gt; -
  This incident has been resolved..&lt;/p&gt;
&lt;p&gt;&lt;small&gt;Jul &lt;var data-var=&#039;date&#039;&gt; 4&lt;/var&gt;, &lt;var data-var=&#039;time&#039;&gt;23:59:52&lt;/var&gt; GMT+0&lt;/small&gt;&lt;br&gt;&lt;strong&gt;Identified&lt;/strong&gt; -
  We are investigating a partial electric outage within the Village..&lt;/p&gt;
]]>
  </content:encoded>
  <pubDate>Thu, 4 Jul 2024 23:59:52 +0000</pubDate>
  <link>https://status.merrillanwi.gov/incident/cly7xidli104240i0oigr18c0z3</link>
  <guid>https://status.merrillanwi.gov/incident/cly7xidli104240i0oigr18c0z3</guid>
</item>

  </channel>
  </rss>